Metrics finance

Technician efficiency: billable vs. paid hours

Measure technician efficiency as billable hours over paid hours, find the causes of lost time, and fix them with a worked example and weekly routine.

Ava research teamPublished 7 min read

On this page
  1. The efficiency formula
  2. Why efficiency matters more now
  3. Where the hours go
  4. How to measure it
  5. Example: two service techs, one week
  6. Efficiency in different trades and roles
  7. Setting targets
  8. Coaching without gaming
  9. The phone call shapes the visit
  10. Frequently asked questions
  11. References

Key takeaways

  • Labor efficiency = billable hours ÷ paid hours. It shows how much of the payroll you pay for turns into work you can invoice.
  • Drive time between jobs is paid working time under federal rules[1], so routing is an efficiency lever, not just a fuel question.
  • With construction job openings far above last year's level[2], getting more billable hours from the current team is often easier than hiring.
  • Most lost hours come from a few causes: drive time, parts runs, waiting, callbacks and poor information from the phone.

The efficiency formula

Labor efficiency = billable hours ÷ paid hours, for a tech or the whole field team over a week or month.

Paid hours are everything on the paycheck, including overtime, shop time, meetings, training and, depending on your policy, paid time off. Billable hours are the hours spent on work you invoice: diagnosing, repairing, installing and maintaining at customers' sites. If you use flat-rate pricing, you can also track flat-rate efficiency, which is the task hours sold in the price book divided by the hours the tech actually clocked on those jobs. Both are useful; they answer different questions.

  • Labor efficiency asks: how much of the time we pay for reaches a customer?
  • Flat-rate efficiency asks: when the tech is on a job, do they finish within the time the price assumes?
  • Utilization, a related measure, asks: how much of the available schedule did we book? See capacity utilization.

Decide whether to include paid time off in paid hours and keep the rule for the whole year. Including it gives a truer cost picture; excluding it gives a cleaner measure of daily productivity. Most companies report efficiency on worked hours (paid hours minus time off) and handle time off in the labor burden calculation.

Why efficiency matters more now

When techs are easy to hire, you can grow by adding trucks. That is not the market today. US construction job openings were 289,000 in September 2026, against 194,000 a year earlier[2], and average hourly earnings at specialty trade contractors reached $39.05, up 4.7% in a year[3]. Each hour you pay for costs more than it did, and each new hire is harder to find.

US construction job openings, SeptemberNot seasonally adjusted
US construction job openings, SeptemberComparison. September 2025: 194,000; September 2026: 289,000.194,000September 2025September 2025: 194,000289,000September 2026September 2026: 289,000US construction job openings, SeptemberComparison. September 2025: 194,000; September 2026: 289,000.194,000September 2025September 2025: 194,000289,000September 2026September 2026: 289,000

Source: U.S. Bureau of Labor Statistics, 2026[2]

Show the data
ItemValue
September 2025194,000
September 2026289,000

Peak seasons make the problem visible. HVAC techs may be on call and work overtime or irregular schedules during peak heating and cooling seasons[4], and overtime raises the cost of every hour without adding billable capacity. Under the Fair Labor Standards Act, non-exempt employees must be paid at least time and a half for hours over 40 in a workweek, and hours cannot be averaged across weeks[5]. An extra billable hour per tech per day from better routing is worth more in July than any overtime shift.

Where the hours go

Common causes of low technician efficiency
Cause of lost timeHow to spot itTypical fix
Drive time between jobsGPS miles and drive minutes per jobZone scheduling, fewer cross-town assignments
Parts runsSupply-house stops in GPS data, second visits for partsBetter truck stock, model numbers captured on the call
Waiting at the shopLate first-job arrival, morning idle timeLoaded trucks, take-home vehicles, first jobs near home
Callbacks and warrantyReturn visits within 30 daysRoot-cause review, commissioning checklists
Poor job informationLong diagnosis, wrong equipment on siteStructured intake questions on every call
Admin in the fieldLong gaps between job finish and next driveSimple mobile forms, office handles paperwork
Schedule gapsIdle time after cancellationsWaitlist and same-day fill process

Drive time deserves the most attention, because it is both large and controllable. Federal rules treat travel from job site to job site during the workday as hours worked[1], so every unnecessary mile is paid time that produces nothing. A dispatcher who keeps a tech in one zone all day can recover hours a week without anyone working faster.

How to measure it

  1. Get clean time data

    Use field app clock-in and clock-out per job and the payroll record for total paid hours. Timesheets filled in from memory are not good enough.

  2. Define billable consistently

    On-site time on invoiced jobs counts. Drive time does not, even though it is paid. Callbacks and warranty visits do not, because they are not invoiced.

  3. Calculate weekly by tech

    Billable hours ÷ worked hours for each tech, and for the team.

  4. Add the cause data

    Beside each tech's efficiency, show drive minutes per job, parts runs, callbacks and idle time after cancellations.

  5. Compare like with like

    Maintenance techs, service techs and installers have different patterns. Compare techs within each group.

Example: two service techs, one week

Example (fictional): an electrical contractor reviews two service electricians for a week. Both worked 45 hours. Marcus billed 29 hours, an efficiency of 64%. Leah billed 34 hours, 76%.

Example diagnosis: Marcus drove 11.5 hours across 14 jobs, made four supply-house runs and had one callback that took 2.5 hours. Leah drove 7 hours across 15 jobs, made one supply run and had no callbacks. Marcus is not slower on the job; his flat-rate efficiency is actually slightly better than Leah's. His schedule sent him across the county three days in a row, and two of his supply runs were for breakers the office could have identified on the call.

Example fix: the dispatcher assigns Marcus to the north zone for the next month, the office adds panel brand and age to the intake questions, and his truck gets two more breaker types in stock. Four weeks later Marcus averages 31.5 billable hours on the same 45 worked hours, 70%. At an example billing rate of $135 an hour, the extra 2.5 hours a week is worth about $17,500 in revenue a year from one tech, with no extra payroll.

Efficiency in different trades and roles

The formula is universal, but what good looks like depends on the work. Compare techs only with others doing similar work, and expect these patterns.

  • Install crews usually show higher labor efficiency than service techs, because a full-day install has one drive in the morning and little travel during the day. Their risk is overrun against quoted hours, so watch flat-rate or quoted-hours efficiency more closely.
  • Service and repair techs lose the most to drive time and parts runs. Routing and truck stock matter more for them than speed on the job.
  • Maintenance techs on agreement visits can be very efficient when visits are clustered by neighborhood, and very inefficient when they are booked wherever the customer prefers. Group plan visits by zone and season.
  • Route-based trades such as pest control and lawn care measure efficiency per stop and per route, where drive time between stops is the main variable and density is everything.
  • Apprentices pull down a crew's efficiency while they learn. Track their hours separately so the cost of training is visible and not mistaken for poor performance by the lead tech.

Seasonality also shifts the numbers. In the busiest weeks, efficiency often rises because the schedule is full and gaps are rare, even as callbacks creep up. In shoulder seasons, gaps open and efficiency falls unless the office fills them with maintenance visits and follow-ups on unsold estimates.

Setting targets

Published targets vary widely and rarely share a definition. Build yours from your own data: take each group's best four weeks from last year as the stretch target and the median week as the floor. Review targets each season, because summer HVAC and winter HVAC are different businesses.

Tie the target to the price book. If your prices assume a certain number of billable hours per tech per day, efficiency below that assumption means every job is underpriced. Our revenue per technician guide shows how efficiency, jobs per day and average invoice combine.

Coaching without gaming

Efficiency measures can be gamed. A tech can rush diagnosis, skip a maintenance step or avoid difficult jobs to raise billable hours. Watch for these side effects:

  • Rising callbacks or warranty visits after efficiency rises.
  • Falling close rates, because rushed techs present fewer options.
  • Customer complaints about rushed visits or incomplete work.
  • Techs refusing jobs far from home or late in the day.

Report efficiency next to callbacks and close rate, and coach on causes rather than the number. Most of the fixes in this article sit with dispatch, the office and the warehouse, not with the tech. Telling a tech to be more efficient without fixing their schedule only frustrates good people. Pairing efficiency with membership metrics also helps, because maintenance visits that are scheduled well fill otherwise idle hours.

The phone call shapes the visit

Many lost field hours start at the first phone call. A tech who arrives without knowing the equipment brand, its age, the symptoms or the access details spends the first half hour finding out, and often makes a supply run afterwards. A short structured intake on every call, whoever answers it, is one of the cheapest efficiency gains available. It also improves the funnel upstream; see our guide to the service call funnel and to ROI by lead source, since channels that send poorly described jobs cost more in field time.

Review a handful of job tickets each week with the dispatcher and ask one question: what did the tech need to know before arriving that the ticket did not say? Add it to the intake script. Within a few months the information gap that drives most diagnosis delays and parts runs closes on its own.

Frequently asked questions

Should drive time count as billable?

Not in the efficiency calculation, even if you charge a trip fee. Trip fees cover drive cost; efficiency measures how much paid time is spent on the work itself. Track drive time separately.

Is 100% efficiency possible?

No. Some drive time, shop time and admin is unavoidable. Flat-rate efficiency can exceed 100% when techs finish faster than the price book assumes, but labor efficiency on paid hours cannot.

How often should I review efficiency?

Weekly for the team and monthly for individual coaching. Individual weeks are noisy, so look for patterns over four weeks before acting.

References

  1. U.S. Department of Labor, Wage and Hour Division (2026). Fact Sheet #22: Hours Worked Under the Fair Labor Standards Act (FLSA) (opens in a new tab) ↑

  2. U.S. Bureau of Labor Statistics (2026). Job Openings and Labor Turnover Survey: construction job openings (JTU230000000000000JOL) (opens in a new tab) ↑

  3. U.S. Bureau of Labor Statistics (2026). Current Employment Statistics: average hourly earnings, specialty trade contractors (CEU2023800008) (opens in a new tab) ↑

  4. U.S. Bureau of Labor Statistics (2025). Heating, Air Conditioning, and Refrigeration Mechanics and Installers: Occupational Outlook Handbook (opens in a new tab) ↑

  5. U.S. Department of Labor, Wage and Hour Division (2026). Overtime Pay (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo